Speed determines your profit margins in the competitive plastic injection industry. Recently, a Guangzhou plastic products company revolutionized their 200T Injection Machine production floor. They successfully reduced downtime on their plastic injection machine by switching to advanced magnetic technology. This guide explores how you can achieve a three-minute mold change.
Step 1: Eliminate Manual Bolting
Traditional setups require workers to use "bridge clamps" and heavy bolts to secure molds. However, this manual process is slow and physically exhausting for the staff. To improve speed, you must replace these mechanical fasteners with a permanent magnetic system. HVR MAG provides the magnetic quick mold change system specifically for a 200T injection machine. This system uses electric pulses to lock the mold in seconds.
The customer in Guangzhou reported significant improvements after implementing this technology in December 2025.
-Labor Efficiency: The new system drastically lowered the physical workload for changeover crews.
-Production Yield: Faster transitions directly increased the daily output of the factory.
-Cost Control: Reducing changeover time helped the company minimize overall operational expenses.
-Ease of Use: The staff found the new system very easy to learn and master.
Upgrading a 200T injection machine is the fastest way to modernize your facility. By removing manual clamps, you transform a thirty-minute chore into a three-minute success. Ultimately, this investment pays for itself through increased machine uptime and lower labor costs.
Would you like me to create a comparison table between manual clamping and magnetic platens for your 200T machine?
Work directly with our experienced team to solve your toughest engineering challenges